1x 130m & 1x 180m Geothermal Boreholes in North London

2x varying borehole depths installed for a house refurbishment and new build property near Tottenham

Location

Tottenham

Method

Mud Drilling

Geology

Grey Clay
Chalk with flint deposits

Equipment Used

  • GTD GT35
  • GTD Mud Guzzler
  • MultiOne Loader
  • Hitachi Excavator

Related work

1 min read

17x 200m Geothermal boreholes installed on a commercial project in Lincoln

Future Drilling Services successfully completed the installation of 17x 200m geothermal boreholes on a project in Lincoln

Read article
1 min read

12x 170m Geothermal boreholes installed near Leeds for a Department of Education project

Future Drilling Services successfully completed the installation of 12x 170m geothermal boreholes on a primary school project near Leeds

Read article
1 min read

2x 125m Geothermal Boreholes Installed near Cobham, SW London

Future Drilling Services successfully completed the installation of 2x 125m geothermal boreholes on a domestic property near Cobham, South West London

Read article