17x 200m Geothermal boreholes installed on a commercial project in Lincoln

The drill crew successfully installed 17x 200m geothermal boreholes at a commercial project near Lincoln

Location

Lincoln

Method

Mud Drilling

Geology

Limestone
Hard Grey Clay

Equipment Used

  • GTD GT35
  • GTD Mud Guzzler
  • MultiOne Loader
  • 6m Temporary Casing

Related work

1 min read

12x 170m Geothermal boreholes installed near Leeds for a Department of Education project

Future Drilling Services successfully completed the installation of 12x 170m geothermal boreholes on a primary school project near Leeds

Read article
1 min read

2x 125m Geothermal Boreholes Installed near Cobham, SW London

Future Drilling Services successfully completed the installation of 2x 125m geothermal boreholes on a domestic property near Cobham, South West London

Read article
1 min read

1x 200m TRT geothermal borehole installed at a Grade 1 listed property near Reading

Future Drilling Services successfully completed the installation of a 200m TRT geothermal boreholes on a Grade 1 listed property near Reading

Read article