5x 175m Geothermal Boreholes Installed near Welwyn Garden City

With challenging chalk conditions, Future Drilling applied an air drilling method to achieve 175m depths in less than 2 hours per borehole.

Location

Welwyn Garden City

Method

Air Drilling

Geology

Chalk

Equipment Used

  • GTD GT35 Drilling Rig
  • 980CFM Compressor
  • MultiOne Loader

Related work

1 min read

17x 200m Geothermal boreholes installed on a commercial project in Lincoln

Future Drilling Services successfully completed the installation of 17x 200m geothermal boreholes on a project in Lincoln

Read article
1 min read

12x 170m Geothermal boreholes installed near Leeds for a Department of Education project

Future Drilling Services successfully completed the installation of 12x 170m geothermal boreholes on a primary school project near Leeds

Read article
1 min read

2x 125m Geothermal Boreholes Installed near Cobham, SW London

Future Drilling Services successfully completed the installation of 2x 125m geothermal boreholes on a domestic property near Cobham, South West London

Read article